Difference between revisions of "Workdocumentation 2021-03-12"
Jump to navigation
Jump to search
Musaab Khan (talk | contribs) (Created page with "*End date should be depended on the start date **if start date is selected enddate should contain the same date") |
Musaab Khan (talk | contribs) |
||
| Line 1: | Line 1: | ||
*End date should be depended on the start date | *End date should be depended on the start date | ||
**if start date is selected enddate should contain the same date | **if start date is selected enddate should contain the same date | ||
| + | |||
| + | *Location should be directly under general information | ||
Revision as of 08:33, 12 March 2021
- End date should be depended on the start date
- if start date is selected enddate should contain the same date
- Location should be directly under general information