Difference between revisions of "Workdocumentation 2021-03-12"
Jump to navigation
Jump to search
Musaab Khan (talk | contribs) |
Musaab Khan (talk | contribs) |
||
Line 1: | Line 1: | ||
− | *End date should be depended on the start date | + | *Heike |
− | **if start date is selected enddate should contain the same date | + | |
+ | **End date should be depended on the start date | ||
+ | ***if start date is selected enddate should contain the same date | ||
+ | **An other field in deadlines to cater the different kinds of deadlines of different conferences. | ||
+ | **Location fields should be included in general information | ||
+ | |||
− | |||
*Julian | *Julian | ||
− | ** | + | **The deadlines to be in a dropdown and then selected. Feasibility check required. |
− | ** | + | **More fields in Bibliographic with the same idea of dropdown. |
− | |||
− |
Revision as of 10:06, 12 March 2021
- Heike
- End date should be depended on the start date
- if start date is selected enddate should contain the same date
- An other field in deadlines to cater the different kinds of deadlines of different conferences.
- Location fields should be included in general information
- End date should be depended on the start date
- Julian
- The deadlines to be in a dropdown and then selected. Feasibility check required.
- More fields in Bibliographic with the same idea of dropdown.