Difference between revisions of "Workdocumentation 2021-03-12"

From OPENRESEARCH mk copy Wiki
Jump to navigation Jump to search
Line 1: Line 1:
*End date should be depended on the start date
+
*Heike
**if start date is selected enddate should contain the same date
+
 
 +
**End date should be depended on the start date
 +
***if start date is selected enddate should contain the same date
 +
**An other field in deadlines to cater the different kinds of deadlines of different conferences.
 +
**Location fields should be included in general information
 +
 
  
*Location fields should be included in general information
 
  
 
*Julian  
 
*Julian  
**Julian would like the deadlines to be in a dropdown and then selected. Feasibility check required.
+
**The deadlines to be in a dropdown and then selected. Feasibility check required.
**Julian would like more fields in Bibliographic with the same idea of dropdown.
+
**More fields in Bibliographic with the same idea of dropdown.
 
 
*An other field in deadlines to cater the different kinds of deadlines of different conferences.
 

Revision as of 10:06, 12 March 2021

  • Heike
    • End date should be depended on the start date
      • if start date is selected enddate should contain the same date
    • An other field in deadlines to cater the different kinds of deadlines of different conferences.
    • Location fields should be included in general information


  • Julian
    • The deadlines to be in a dropdown and then selected. Feasibility check required.
    • More fields in Bibliographic with the same idea of dropdown.